Nuneaton running the Cov-Solihull routes, and that section of the X20 is renumbered back to 82, timetables on their website already.
Presumably these routes would eventually have to be electric to be allowed into Coventry?
Presumably these routes would eventually have to be electric to be allowed into Coventry?