For a period of around 3 weeks towards the end of October while the line is connected into the new extension Metro will terminate at St Paul's.
Details of this 3 week period are still being finalised and we will be publishing the alternate arrangements for getting to Snow Hill when they become available.
Once the works are complete Metro will run into the new Snow Hill stop which is situated on a bridge over the ring road and connection into the heavy rail station will be via stairs and walking via Livery St to Snow Hill second access or by walking up the Metro route past Snow Hill One and Two to the front entrance of Snow Hill station.
When the remainder of the route opens at the end of the year Bull Street will provide a level walking route through to the front entrance of Snow Hill station.
The new extension means that Metro will continue from St Paul's to the new stop at Snow Hill then onto stops at Bull Street, Corporation Street and then Grand Central at New Street Station. This extension will open by the end of the year.
Details of this 3 week period are still being finalised and we will be publishing the alternate arrangements for getting to Snow Hill when they become available.
Once the works are complete Metro will run into the new Snow Hill stop which is situated on a bridge over the ring road and connection into the heavy rail station will be via stairs and walking via Livery St to Snow Hill second access or by walking up the Metro route past Snow Hill One and Two to the front entrance of Snow Hill station.
When the remainder of the route opens at the end of the year Bull Street will provide a level walking route through to the front entrance of Snow Hill station.
The new extension means that Metro will continue from St Paul's to the new stop at Snow Hill then onto stops at Bull Street, Corporation Street and then Grand Central at New Street Station. This extension will open by the end of the year.