QuoteJust an idea if there is enough demand to reopen Darlaston and Willenhall there must be enough demand for passengers to want to travel on the Walsall to Wolverhampton line so here is an idea.Where are the train crew going to be sourced from, would involve a recast of the Walsall line to facilitate extra trains, availability of rolling stock and wouldn't it be best to trial a lower frequency to guage usage (walk before you can run)
The Journey time between Walsall and Wolverhampton is 15 minutes so why not at peak times run an every 15 minute service from Walsall to Wolverhampton
Leaving Walsall sat say 07:15 and then either doing a 07:40 train back to Walsall from Wolverhampton probably require two units. Then during the day they could run this every half an hour or have that unit do other services until say 4PM when it could start the service back. With J10 still being not complete and as a result the 529's being in a mess they could trail it would be a way to keep Services down the line ready for when it opens and also a trail of planned service you could even extend a service to Birmingham semi fast from Walsall stopping at Bescot and Tame Bridge like the original proposal but without stopping at Willenhall and Darlaston as they aren't open yet.
Speaking of Darlaston I passed over the Bridge by the Station on Monday on the 37 and there is absolutely no way that Station is opening any time soon. I have no idea about Willenhall as I don't go that way. But I believe Darlaston was due to open first. I know they had contractor issues but surely these have been resolved there was no sign of anything happening when I past around 1/2 PM on Monday on the bus